Ovingham Level Crossing Project

Builder

McConnell Dowell

The Project

Ovingham Level Crossing Removal project’s objective was to separate the rail line from the road (grade separation) at the Torrens Road level crossing, which improved safety for all road users (motorists, cyclists and pedestrians). For this project, Hallett used their Enviro Construct Concrete and was able to replace 50% of GP Cement with a blend of Flyash and Slag to reduce carbon emissions.

Delivered
  • 5000m3 of our Enviro Construct DIT range
  • Concrete produced from Mile End Wet Batch Plant
  • Piling, structural and non structural used Enviro Construct
  • Concrete met DIT specifications
  • First time a triple blend was used in structural elements